First published · Last updated
Utility works road disruption — [A104] BALLS POND ROAD (E8 ,N1 ) (Hackney,Islington)
Temporary traffic signals are in use to facilitate emergency Cadent Gas works, and traffic is reported to be flowing well. The works are scheduled from September 29 to October 12, 2026.
Categories: travel-and-transportation
Generated scores
Scores are based on the cited reporting and use a 1–10 scale. Read the methodology.
- Confidence
- 8/10
- Geographic reach
- 1/10
- Global importance
- 1/10
- Impact magnitude
- 2/10
- Positivity
- 4/10
- Urgency
- 2/10
Why it matters
The source reports a road disruption, while noting that traffic is flowing well.
Location
Sources
- Utility works road disruption — [A104] BALLS POND ROAD (E8 ,N1 ) (Hackney,Islington)Powered by TfL Open Data. Contains OS data © Crown copyright and database rights 2016. Geomni UK Map data © and database rights 2019. Usage terms

