First published · Last updated
Utility works road disruption — [A12] BLACKWALL TUNNEL NORTHERN APPROACH (E14 ,E3 ) (Tower Hamlets)
Cadent Gas works closed one of three lanes at the junction of Lochnagar Street on the A12 Blackwall Tunnel Northern Approach; traffic was reported flowing well. The works were listed from October 2 to October 8, 2026.
Categories: travel-and-transportation
Generated scores
Scores are based on the cited reporting and use a 1–10 scale. Read the methodology.
- Confidence
- 6/10
- Geographic reach
- 1/10
- Global importance
- 1/10
- Impact magnitude
- 2/10
- Positivity
- 4/10
- Urgency
- 2/10
Why it matters
The lane closure is a local road disruption, although traffic was reported flowing well.
Location
Sources
- Utility works road disruption — [A12] BLACKWALL TUNNEL NORTHERN APPROACH (E14 ,E3 ) (Tower Hamlets)Powered by TfL Open Data. Contains OS data © Crown copyright and database rights 2016. Geomni UK Map data © and database rights 2019. Usage terms

