First published · Last updated
Utility works road disruption — [A4005] HANGER LANE (W5 ) (Ealing)
Temporary traffic signals for Thames Water utility works at Hanger Lane and Quill Street are causing slow traffic and tailbacks, with delays expected. The works are listed from 2026-10-07 to 2026-10-08.
Categories: travel-and-transportation
Generated scores
Scores are based on the cited reporting and use a 1–10 scale. Read the methodology.
- Confidence
- 7/10
- Geographic reach
- 1/10
- Global importance
- 1/10
- Impact magnitude
- 3/10
- Positivity
- 3/10
- Urgency
- 4/10
Why it matters
The works are disrupting traffic in both directions on Hanger Lane.
Location
Sources
- Utility works road disruption — [A4005] HANGER LANE (W5 ) (Ealing)Powered by TfL Open Data. Contains OS data © Crown copyright and database rights 2016. Geomni UK Map data © and database rights 2019. Usage terms

