First published · Last updated
Vehicle breakdown road disruption — [A2] DEPTFORD BROADWAY (SE8 ) (Lewisham)
A broken-down vehicle blocked one lane of three on the eastbound A2 at Deptford Broadway, with traffic reported tailing back to New Cross Gate. The source reported the disruption at 08:36 UTC on October 14, 2026.
Why it matters
The lane closure and reported traffic delays may affect people traveling through Deptford Broadway and New Cross Gate.
Location
Categories: travel-and-transportation
Generated scores
Scores are based on the cited reporting and use a 1–10 scale. Read the methodology.
- Confidence
- 6/10
- Geographic reach
- 1/10
- Global importance
- 2/10
- Impact magnitude
- 2/10
- Positivity
- 3/10
- Urgency
- 4/10
Primary official sources
- Transport for London Road DisruptionsVehicle breakdown road disruption — [A2] DEPTFORD BROADWAY (SE8 ) (Lewisham)Powered by TfL Open Data. Contains OS data © Crown copyright and database rights 2016. Geomni UK Map data © and database rights 2019. Usage terms
Read our editorial process and corrections policy.

